text me aT 919 673 3246

Include pictures and your location

epoxy applications in a day. upfront prices. Easy to understand methods.

No need for on-site meetings. Some companies use them for a sales pitch and overcharge.

book now

Price includes everything - labor and materials

 

ESTIMATE

  • Share a photo of your floor for an accurate estimate.

SCHEDULING

  • Once you approve the estimate, let me know when you want the work done.

COLOR

  • Pick a color from our website and let me know

Single: $645 | Oversized: $745

This picture shows a single car garage. Anything with a staircase, oil stains or bigger than this picture is considered an oversized single car garage.

Double: $895 | Oversized: $985

This picture shows a double car garage. Anything with two garage doors, a staircase, oil stains or bigger than this picture is considered an oversized double car garage.

Triple: $1395 | Oversized: $1495

This picture shows a triple car garage. Anything with a staircase, oil stains or bigger than this picture is considered an oversized triple car garage.

discounts

Promotions exclusively valid for these colors.

Dark Gray | Black Space | Blue Gray

 
  • 2 neighbors: $40

  • 4 neighbors: $70

  • 5 neighbors: $100

warranty

I agree to repair delamination in the epoxy for a period of 5 years (from the effective date of installation) caused by Improp substrate preparation and workmanship in the Application.

This warranty does not apply and will be voided for any damages to the coating caused by physical or mechanical abuse, efflorescence, exposure to chemicals, solvents, and acids, lack of maintenance and care, hydrostatic water, internal failure of the substrate, rusting, variations in color, dullness, outgassing, cracking due to substrate movement, existing coatings underneath, moisture, or any acts of God. My liability is limited to the cost of the service provided, and I am not responsible for any consequential damages or loss of profits. Both parties agree that in the event of any dispute or claim arising from this warranty, each party shall bear their own legal fees and costs, and neither party shall be entitled to recover legal fees or costs from the other party, unless otherwise agreed in writing. All claims for delamination must be submitted in writing with clear photographic evidence attached. By accepting the services, the customer acknowledges and agrees to the terms and conditions of this warranty

Last update 4/26/2023

installation PROCESS

surface preparation

I am experienced in evaluating and preparing concrete floors to meet rigorous industry standards. The preparation of the concrete substrate is often the most critical step. Different solutions and equipment are used to effectively remove the top cream layer of concrete to expose a porous surface to ensure the best adhesion.

EPOXY application

After the surface is fully prepped and cleaned, industrial-grade epoxy is applied with a combination of a squeegee and rollers. This is immediately followed by decorative color chips. The garage door is then lowered, leaving a space between the floor to avoid any damage and let the epoxy dry overnight. 

DRYING & CURING TIME

Epoxy will be dry to the touch within 24 hours of mixing and pouring. The epoxy will not flake or lift as long as you wait 72 hours for the epoxy to fully cure. 

  • 24 hours - to walk on

  • 48 Hours - to move heavy items

  • 72 Hours - to drive on

available colors

Industrial Grade Epoxy

EPOXY COLOR: DARK GRAY

FLAKE COLOR: BLACK BLEND

EPOXY COLOR: BLUE GALAXY

FLAKE COLOR: BLACK BLEND

EPOXY COLOR: BLACK ORANGE

FLAKE COLOR: ORANGE BLEND

EPOXY COLOR: PUMPKIN

FLAKE COLOR: BROWN BLEND

EPOXY COLOR: BLACK SPACE

FLAKE COLOR: BLACK BLEND

EPOXY COLOR: BLUE GRAY

FLAKE COLOR: BLACK BLEND

EPOXY COLOR: TAN

FLAKE COLOR: BROWN BLEND

EPOXY COLOR: GREEK OLIVE

FLAKE COLOR: BROWN BLEND

EPOXY COLOR: FLINTSTONE GRAY

FLAKE COLOR: BLACK BLEND

important

In the event of inclement weather, such as rain or cold temperatures, your installation may be delayed or rescheduled. please have all items moved out of the garage and all vehicles must be off the driveway to avoid delays. electricity and water must be available at the time of installation. Epoxy has a strong odor, so it is recommended to keep windows or doors open for ventilation during the installation process. Payment is due immediately after the work is completed, and the preferred method of payment is cash.

installation

My workday starts early in the morning either 7:00 or 9:00 am depending on what we agreed. a text message is sent to you 15 minutes before I arrive at your residence. once onsite I briefly introduce myself to you and go over the process. After the epoxy application is completed we do a walkthrough to ensure your fully satisfied with the work performed.